1.01: Introduction and Purpose
1.02: Statement of Jurisdiction
1.03: General Provisions
1.04: Definitions
1.05: Procedures
2.00 Additional Regulations for Wetland Resource Areas
2.02 Buffer Zone
2.03 Freshwater Wetlands
2.04 Coastal Bank
2.05 Land Subject to Coastal Storm Flowage and Wellfleet Harbor Area of Critical
Environmental Concern
1.01: Introduction and Purpose:
(1) Introduction. The Wellfleet Environmental Protection Regulations (hereinafter
referred to as “WEPR or the Regulations”) are promulgated by the Town of
Wellfleet Conservation Commission (hereinafter referred to as the
“Commission”) pursuant to the authority granted under the Wellfleet
Environmental Protection Bylaw as approved on April 28, 1986 at Town Meeting
as amended (hereinafter referred to as the “Bylaw”). These Regulations shall
complement the Bylaw and shall have the force of law upon their effective date.
(2) Purpose. These Regulations set forth a public review and decision-making
process by which activities affecting Areas Subject to Protection Under the Bylaw
are to be regulated in order to contribute to the following public interests and
values:
- protection of public and private water supply
- protection of ground water quality and supply
- flood control
- erosion and sedimentation control
- storm damage prevention
- prevention of pollution
- protection of land containing shellfish
- protection of fisheries
- protection of wildlife habitat
The purpose of the Regulations is to define and clarify the process by which
the Conservation Commission may carry out its responsibility under the
Bylaw.
1.02: Statement of Jurisdiction:
(1) Areas Subject to Protection Under the Bylaw. The following Wetland Resource
Areas are subject to protection under the Bylaw and Regulations:
(a) any freshwater wetland, inland bank, coastal wetland, coastal bank, beach,
dune, flat, marsh, wet meadow, bog or swamp
(b) any estuary, creek, river, stream, pond, lake and lands under these bodies of
water; land under the ocean
(c) land subject to tidal action, land subject to coastal storm flowage, bordering
land subject to flooding, isolated land subject to flooding
(d) all land within 100 feet of any area specified in WEPR 1.02(1)(a) – (b)
(hereinafter referred to as the “Buffer Zone”)
(e) land in Wellfleet Harbor Area of Critical Environmental Concern (ACEC)
with the exception of privately owned upland areas in Bound Brook and Griffin
Island areas which are not within the jurisdiction of the Massachusetts Wetland
Protection Act or current jurisdiction of the Wellfleet Environmental Protection
By-law
(2) Activities Subject to Regulation Under the Bylaw.
(a) Activities Within an Area Subject to Protection Under the Bylaw. Any
activity which is proposed or undertaken within an area specified in WEPR
1.02(1) which, in the judgment of the Commission, will constitute removing,
filling, dredging or otherwise altering any such area, is subject to jurisdiction
under the Bylaw and Regulations and shall require the filing of a Notice of
Intent or a Request for Determination of Applicability and permission, in the
form of an Order of Conditions or a Determination of Applicability, from the
Commission to proceed. Applicants shall refer to WEPR 1.05 Procedures for
more information on how to file an application with the Commission.
(b) Activities Outside an Area Subject to Protection Under the Bylaw. Any
activity proposed or undertaken outside an area specified at WEPR 1.02(1)
shall not be subject to the jurisdiction of the Commission under the Bylaw and
Regulations unless, in the judgment of the Commission, said activity will or
has resulted in the removing, filling, dredging or alteration of any Area
Subject to Protection Under the Bylaw as set forth at WEPR 1.02(1) and will
or has had a significant or cumulative adverse effect upon the interests and
values as set forth at WEPR 1.01(2).
1.03: General Provisions:
(1) Burden of Proof:
(a) The applicant shall have the burden of proving by a preponderance of
credible evidence that:
1. The activity proposed is not significant to the protection of the public
interests or environmental values as identified under WEPR 1.01(2), or
2. The activity proposed will contribute to the protection of the public
interests and environmental values as identified under WEPR 1.01(2) by
complying with the performance standards established for that particular
resource area. If performance standards for a particular resource area are
not set forth in these Regulations, the Commission shall apply the
performance standards for work in that particular resource area as are
established at 310 CMR 10.00.
3. The activity proposed will not have an adverse impact of either an
immediate or cumulative nature upon the public interests and
environmental values as identified under WEPR 1.01(2).
(2) Burden of Going Forward:
(a) The applicant shall have the burden of going forward with credible
evidence from a competent source in support of all matters asserted by the
applicant in accordance with his/her burden of proof pursuant to WEPR
1.03(1).
(3) Continuing Liability for Compliance with M.G.L. Ch. 131 s. 40 and the
Bylaw:
(a) Any person who purchases, inherits or otherwise acquires real estate upon
which work has been done in violation of the provisions of this Regulation or
in violation of any Order issued under this Regulation shall forthwith comply
with any such order to restore such real estate to its condition prior to such
violation.
(4) Amendments: These regulations may be amended in accordance with Article
9 of the Bylaw.
1.03: General Provisions (Cont.)
(5) Variances:
(a) The Commission may, in its discretion, grant variances from one or more
of the Regulations pursuant to the provisions of this section. Variances shall
be granted on a case-by-case basis and shall not set a precedent for future
Variance requests.
(b) The Commission may, in its discretion, grant a Variance for the following
reasons and under the following conditions:
1. upon clear and convincing proof, provided by the applicant, that the
proposed work, or its impacts and effects, will not adversely affect the
public interests and environmental values protected by the Bylaw. In
exercising its discretion, the Commission shall require an analysis of
reasonable alternatives for the proposed activity which might be
undertaken with less adverse impacts on an Area Subject to Protection
Under the Bylaw as defined at WEPR 1.02(1) and without deviating from
the provisions of these Regulations. The applicant shall provide the
Commission with a written alternatives analysis and any other information
which the Commission requires to make a decision. Failure of the
applicant to provide information within a time period specified by the
Commission may result in the denial for a Variance request.
(6) Severability: The invalidity of any section or provision of this Regulation
shall not invalidate any other section or provision thereof, nor shall it invalidate
any permit or determination which previously has been issued.
1.04: Definitions:
(1) Unless otherwise defined in the Bylaw or Regulations, those definitions set
forth in the Massachusetts Wetlands Protection Act (M.G.L. Ch. 131 s. 40)
and 310 CMR 10.00 shall apply to the Wellfleet Environmental Protection
Regulations.
(2) Additional Definitions:
Activity means any form of draining, dumping, dredging, damming,
discharging, excavating, filling or grading; the erection, reconstruction or
expansion of any buildings or structures; the driving of pilings; the
construction or improvement of roads and other ways; the changing of
run-off characteristics; the intercepting or diverging of ground or surface
water; the installation of drainage, sewage and water systems; the
discharging of pollutants; the destruction of plant life; and any other
changing of the physical characteristics of land.
Alter means to change the condition of any Area Subject to Protection
Under the Bylaw as defined at WEPR 1.02. Examples include, but are not
limited to, the following:
(a) the changing of pre-existing drainage characteristics, flushing
characteristics, salinity distribution, sedimentation patterns, flow
patterns and flood retention areas;
(b) the raising or lowering of the water level or water table;
(c) the destruction of vegetation
(d) the changing of water temperature, biochemical oxygen demand
(BOD), and other physical, biological or chemical characteristics of
the receiving water.
Buffer Zone means that area of land extending 100 feet horizontally
outward from the boundary of any Area Subject to Jurisdiction under the
Bylaw as defined at WEPR 1.02(a) – (b). Refer to WEPR 2.02(4) for the
General Performance Standards for work within the Buffer Zone.
Coastal engineering structure means, but is not limited to, any breakwater,
bulkhead, groin, jetty, revetment, seawall, weir, riprap, gabions, marine
mattress, sandbags, or any other structure that is designed to alter wave,
tidal or sediment transport processes in order to protect inland or upland
structures from the effects of such processes. Planting of vegetation and
placement of biodegradable netting or fabric shall not be considered a
CES.
1.04 (2): Definitions (cont.):
Coastal Wetland shall mean any coastal bank, marsh, swamp, meadow,
flat, land under the ocean, land subject to tidal action, land containing
shellfish and land subject to coastal storm flowage.
Competent Source shall refer to an expert in a particular field and may
include a registered land surveyor, professional engineer, wetland
scientist, soil scientist, geologist, hydrologist, botanist, ecologist,
oceanographer or forester.
Fill means to deposit any material so as to raise an elevation, either
temporarily or permanently. Fill materials may include, but are not
limited to, sand, gravel, loam, shells, stone, concrete and pavement.
Untreated wood materials used for pilings shall not constitute fill.
Freshwater Wetland is defined at WEPR 2.03(2).
Hydric Soil shall mean a soil that is saturated, ponded or flooded long
enough during the growing season to cause anaerobic conditions in the
upper part as evidenced by hydric soil indicators.
Hydric Soil Indicators include histosols; histic epipedons; presence of
sulfidic materials; gleyed soils; soils with a matrix chroma of 0 or 1 and
values of 4 or higher within 12 inches from the bottom of the O-horizon;
soils with a chroma of 2 or less and values of 4 or higher in the matrix and
mottles with a chroma of 3 or higher within 12 inches from the bottom of
the O-horizon; and within 12 inches of the bottom of the O-horizon, soils
with a matrix chroma of 3 and values of 4 or higher, with 10 percent or
more low-chroma mottles, as well as indicators of saturation (i.e., mottles,
oxidized rhizospheres, concretions, nodules) within 6 inches of the soil
surface. In Sandy soils hydric soil indicators include soils with a high
organic content in the surface layer (typically darker colors with values
less than 3 and chroma of 2 or less) with mottles or other indicators of
saturation directly below; soils with organic streaking directly below the
A-horizon; or soils with a matrix chroma of 3 in the top 12 inches of soil
measured from the bottom of the O-horizon, with distinct or prominent
mottling.
Isolated Wetlands are freshwater wetlands and may include wet meadows,
marshes, swamps, bogs and vernal pools which do not border on any
creek, river, stream, pond or lake. Isolated wetlands are areas where the
soils are saturated and/or inundated such that they support a
preponderance of wetland indicator plants, hydric soils or other indicators
of hydrology.
1.04(2): Definitions (cont.):
Pond means any open body of fresh water. Ponds may be naturally
occurring or man-made by impoundment, excavation, or otherwise. Ponds
shall contain standing water except for periods of extended drought.
Notwithstanding the above, the following man-made bodies of
open water shall not be considered ponds:
a. basins or lagoons which are part of a wastewater treatment
plant;
b. swimming pools;
c. stormwater retention basins;
Pruning shall refer to the act of removal of dead, dying, diseased or
undesirable plant parts to reduce a hazard, to improve plant structure, to
provide a vista, or to improve plant health.
Selective Cutting shall mean the selective removal of trees, shrubs,
invasive or exotic plants within an Area Subject to Protection under the
Bylaw.
Subdivision shall mean the division of a tract of land into two or more
lots, including divisions where approval is required and approval is not
required under the Subdivision Control Law M.G.L. C. 41 s. 81K through
81 GG.
Vernal Pool means any confined depression which, in most years, holds
water for a period of time during the year, is free of adult fish populations
and provides wildlife habitat for vernal pool indicator species. All vernal
pools, whether certified by the Massachusetts Natural Heritage and
Endangered Species Program or not, are protected under these Regulations
as freshwater wetlands.
Vernal Pool Indicator Species include but are not limited to Blue-spotted
salamander (Ambystoma laterale), Jefferson salamander (Ambystoma
jeffersonianum), Marbled Salamander (Ambystoma opacum), Four-toed
salamander (Hemidactylium scutatum), Wood Frog (Rana sylvatica),
Eastern Spadefoot toad (Scaphiopus holbrooki), Spotted turtle (Clemmys
guttata), Wood turtle (Clemmys insculpta), Blanding’s turtle (Emydoidea
blandingi), Fairy shrimp (Eubranchipus spp.), and Fingernail clams
(Psidiidae spp.).
Wetland Resource Area shall mean any Area Subject to Jurisdiction Under
the Bylaw [see WEPR 1.02(1)].
WEPR shall mean Wellfleet Environmental Protection Regulations.
1.05: Procedures:
(1) The procedures, requirements and definitions set forth in the Massachusetts
Wetlands Protection Act (M.G.L. Ch. 131 s. 40) and 310 CMR 10.00 are hereby
incorporated and made a part of these Regulations subject to the following:
(a) Where the procedures and requirements set forth in the Massachusetts
Wetlands Protection Act (M.G.L. Ch. 131 s. 40) and its implementing
regulations (310 CMR 10.00) differ or depart from these Regulations or the
Bylaw, the Bylaw and Regulations shall prevail.
(b) Where the language and definitions of the Bylaw or Regulations are more
definitive or protective than those set forth in the Massachusetts Wetlands
Protection Act (M.G.L. Ch. 131 s. 40) and 310 CMR 10.00, the language and
definitions of the Bylaw and Regulations shall prevail.
(c) Where the General Performance Standards of the Bylaw or Regulations
are more definitive or protective than those set forth in the Massachusetts
Wetlands Protection Act (M.G.L. Ch. 131 s. 40) and 310 CMR 10.00, the
General Performance Standards of the Bylaw and Regulations shall prevail.
(2) Filing Requirements:
(a) All applications (Request for Determination of Applicability, Notice of
Intent, Abbreviated Notice of Intent, Abbreviated Notice of Resource Area
Delineation) shall include, at a minimum, all of the following:
1. A written narrative that completely describes the proposed work,
including the methods, materials and equipment to be used, the proposed
means of access to the site, the area(s) where materials are proposed to be
stored/staged, proposed mitigating measures and means of erosion control.
2. Locus map showing the location of the property where work is
proposed
3. Site Plan including but not limited to all of the following:
a. Delineation of all Wetland Resource Areas Subject to Protection
Under the
Bylaw as set forth at WEPR 1.02(1) and the Massachusetts
Wetlands Protection Act, including the location of the 50-ft. Filter
Strip, and the 100-ft. Buffer Zone as defined at WEPR 2.02.
b. Property Boundaries
c. The names of the abutting property owner(s) shall be noted on the
plan.
d. Location of existing and proposed structure(s).
1.05: Procedures (cont.):
4. Re-vegetation plan including a species list and planting schedule (if
applicable)
5. Proper filing fees
(b) Applications that include changes in the topography, elevation or grade on
a property shall include a site plan that shows the existing and proposed
site conditions including topography/elevation ; the location of all existing
and proposed structures; and the boundaries of all Wetland Resource
Areas.
(c) Where Coastal Engineering Structures (CES) are proposed, the applicant
shall refer to WEPR 2.04 for additional filing requirements:
(3) Fees:
(a) Fee Schedule
Request for Determination of Applicability $ 20.00
Notice of Intent $ 45.00
Certificate of Compliance $ 15.00
Amended Order of Conditions $ 25.00
Coastal Engineering Structure $ 2.00/ linear ft.
Docks $ 2.00/ linear ft.
Re-issuance of a permit* $ 20.00
After-the-fact filing of a Notice of Intent $ 90.00
Jurisdictional Opinion $15.00
(4) Certificate of Compliance
(a) Upon Completion of the work described in the Order of Conditions, the
applicant shall request in writing the issuance of a Certificate of Compliance
stating that the work has been satisfactorily completed.
(b) If the Commission determines, after review and inspection, that the work
has not been done in compliance with the Order of Conditions, it may refuse
to issue a Certificate of Compliance. Such a refusal shall be in writing and
shall specify the reasons for denial.
(c) If a project has been completed in accordance with plans stamped by a
registered professional engineer, architect or land surveyor, a written
statement by such a professional person certifying substantial compliance with
the plans and setting forth what deviation, if any, exists from the plans
approved in the Order shall accompany the request for a Certificate of
Compliance.
(d) If the Order of Conditions contains conditions which continue past the
completion of the work, such as maintenance, nourishment or monitoring,
1.05: Procedures (cont.):
the Certificate of Compliance shall specify which, if any, of such
conditions shall continue. The Certificate shall also specify to what portions
of the work it applies, if it does not apply to all the work regulated by the
Order.
(e) The Certificate of Compliance shall be recorded in the Land Court or
Registry of Deeds, whichever is appropriate. Certification of recording shall
be sent to the Commission on the form at the end of Form 8.
(5) Enforcement
(a) Pursuant to the provisions of M.G.L. Ch. 40 § 21D and the Town of
Wellfleet General Bylaw Article IX § 1, the Conservation Commission
may issue fines of up to $ 200 per violation per day for any violation of
any provision of the Wellfleet Environmental Protection Bylaw and
Regulations.
2.00: Additional Regulations for Wetland Resource Areas
2.02: Buffer Zone (including the 50-foot Filter Strip) :
(1) Preamble: The 100-foot Buffer Zone is likely to be significant to public
and private water supply, ground water quality and supply, flood control,
erosion and sedimentation control, storm damage prevention, prevention
of pollution, the protection of land containing shellfish, the protection of
fisheries and the protection of wildlife habitat.
The buffer zone is a transitional area that extends 100-feet horizontally
into the uplands from the landward boundary of any freshwater wetland,
inland bank, coastal wetland, coastal bank, beach, dune, flat, marsh, wet
meadow, bog, swamp, estuary, creek, river, stream, pond, lake, the lands
under these bodies of water and the land under the ocean.
The composition of the vegetation, topography, and soils within
undisturbed buffer zones is widely variable, the diversity of which
contributes to all of the public interests and environmental values
protected under the Wellfleet Environmental Protection Bylaw.
Vegetated buffer zones reduce impacts to wetland resource areas by
moderating the effects of stormwater flow. Undisturbed vegetation
stabilizes the soil which prevents erosion; filters suspended solids,
nutrients, and harmful or toxic substances; and moderates water level
fluctuations. Vegetated buffer zones, and the woody debris, fallen leaves
and organic matter associated with naturally vegetated areas, reduce the
velocity and erosive force of stormwater flow through the Buffer Zone,
2.02: Buffer Zone (including the 50-foot Filter Strip) (cont.):
and allow suspended sediments to settle out and the stormwater to infiltrate
into the ground before reaching wetlands and surface waters. Nutrients and
contaminants associated with stormwater runoff are taken up and utilized by
plants and microorganisms or are adsorbed into the soils. The removal of
sediment and nutrients by the plants and soils within the buffer zone protects
wetlands and waterways from potential algal blooms and other impacts to
surface water quality. Trees and shrubs within the buffer zone provide soil
stability and shade to adjacent wetlands and water bodies which helps to
control water temperature, aquatic vegetation, dissolved oxygen concentration
and nuisance algae growth within surface waters.
The diversity of trees, shrubs and woody debris provides important
food, cover, thermal protection, nesting, roosting and breeding sites for large
and small mammals, birds, reptiles and amphibians. Contiguously vegetated
buffer strips also provide valuable wildlife corridors. The Town of Wellfleet
is host to a variety of rare plants and wildlife that depends on habitat
requirements provided by the buffer zone.
Exotic and/or invasive vegetation within the buffer zone reduces the
natural productivity and value of these areas.
The Buffer zone is essential to the protection of wetland resource
areas. The ability of the Buffer Zone to provide the benefits and
environmental values that are protected under the Wellfleet Environmental
Protection Bylaw is directly proportional to the width of the Buffer Zone
provided. Therefore any activity proposed within the Buffer Zone shall avoid,
minimize and/or mitigate any adverse impacts in order to provide the greatest
level of protection to the public interests and environmental values protected
under the Wellfleet Environmental Protection Bylaw.
(2) Definition, Critical Characteristics and Boundary
(a) The Buffer Zone shall refer to that area of land extending 100-feet
horizontally outward from the boundary of any Area Subject to Protection
under the Bylaw as defined at WEPR 1.02(a) – (b). The Buffer Zone shall be
further sub-divided to include:
1. The “50-foot Filter Strip” shall refer to that area of land extending 50-
feet horizontally outward from the boundary of any Area Subject to
Jurisdiction under the Bylaw as defined at WEPR 1.02(a) – (b).
2.02: Buffer Zone (including the 50-foot Filter Strip) (cont.):
(3) Presumption of Significance:
Where a proposed activity involves work within the 100 foot Buffer Zone to an
Area Subject to Protection Under the Bylaw as defined at WEPR 1.02(1)(a)–(b),
the Commission shall presume that such area is significant to the interests and
environmental values specified in the Bylaw. This presumption may be overcome
only upon clear and convincing proof, provided by the applicant that the buffer
zone does not play a role in the protection of said interests and environmental
values protected by the Bylaw.
(4) General Performance Standard
(a) Where the presumption set forth in WEPR 2.02(3) is not overcome, any
proposed work in the Buffer Zone shall not destroy or otherwise impair any
portion of said area.
(b) Where the Buffer Zone overlays other resource areas subject to protection
under the Bylaw, the applicable performance standards for each resource area
shall be independently and collectively applied and the project appropriately
conditioned to protect all stated interests.
(c) Notwithstanding the provisions of WEPR 2.02(4)(a), the Commission may
issue an Order of Conditions permitting work in the Buffer Zone provided that
the applicant has examined all practicable alternatives to the project which
would further minimize impacts to the Buffer Zone and has demonstrated that
all impacts will be properly mitigated. The alternatives analysis shall be
submitted to the Conservation Commission in writing.
1. Activities within the 100-foot Buffer Zone shall avoid, minimize and
mitigate adverse impacts. The purpose of evaluating project alternatives is
to locate activities so that impacts to the Buffer Zone and Areas Subject to
Protection Under the Bylaw, as defined at WEPR 1.02(1)(a) – (b), are
avoided to the extent practicable. As much of a project as feasible shall be
sited outside the Buffer Zone. If locating a project entirely outside the
Buffer Zone is not practicable, the alternatives shall be evaluated in order
to locate the project as far as possible from the Area Subject to Protection
Under the Bylaw as defined at WEPR 1.02(1)(a) – (b)and to minimize
impacts to the buffer zone.
2. An alternative shall be considered practicable if it is available and
capable of being done. Practicable alternatives may include realignment,
reconfiguration or re-sizing of project components to minimize impacts to
the Buffer Zone. Projects involving demolition of an existing structure
and reconstruction of a new dwelling shall be subject to an alternatives
analysis and the provisions of 2.02(4)(c).
2.02(4): Buffer Zone (including the 50-foot Filter Strip) (cont.):
(d) Where no practicable alternatives are available or capable of being done
which would otherwise avoid or minimize adverse impacts to the buffer zone,
the following standards shall apply:
1. No Significant Adverse Impact:
a. Within the 100-foot Buffer Zone, the Commission may allow the
total alteration of up to 5000 square feet on a lot recorded prior to
November 19, 2003 subject to the following:
i. The total alteration of the land area within the buffer zone shall
be calculated in square feet by summing up the total area of the
lot, within the buffer zone, that is currently altered or
developed (including yard areas consisting of turf lawns) and
shall include that area which is proposed to be altered,
permanently or temporarily. Any area where vegetation is to be
removed or where soils are to be disturbed shall be included in
this calculation. The limit of work will normally reflect the
limit of the altered area and shall be shown clearly and
accurately on all plans submitted to the Conservation
Commission at the time of filing.
ii. At a minimum, a 50 foot wide area of undisturbed vegetation
shall be provided between the wetland resource area and the
work. If there is not a 50 foot wide area of undisturbed
vegetation within the buffer zone, the existing vegetative cover
shall be preserved and/or extended beyond 50-feet in some
areas by re-vegetating with native plants to the maximum
amount feasible in order to approximate a 50 foot wide corridor
of native vegetation.
iii. On previously developed or disturbed sites, all work proposed
within the buffer zone shall result in an improvement of the
existing conditions and the capacity of the resource area(s) and
buffer zone to protect the public interests and environmental
values protected under the Bylaw. The Conservation
Commission may require, as mitigation for new alteration
within the Buffer Zone: re-vegetation and restoration of areas
previously altered or disturbed within the buffer zone; rerouting
existing roof runoff through gutters and roof drains
which direct roof drainage into drywells or leaching pits; and
may require drainage improvements and/or other mitigating
measures.
iv. Expansion of existing structures within the Buffer Zone may be
allowed provided that:
2.02(4): Buffer Zone (including the 50-foot Filter Strip) (cont.):
a. No new structure or addition to an existing structure
shall be located closer to a wetland resource area than
existing conditions.
b. The area of the proposed disturbance and all
previously disturbed areas shall not, cumulatively,
exceed the 5,000 square foot threshold for allowable
disturbance within the Buffer Zone.
v. Projects which include substantial demolition (i.e. removal of
more than one exterior wall) and subsequent reconstruction of
a dwelling shall be considered a new building and shall site as
much of the project as possible outside of the buffer zone.
Projects for expansion of existing homes greater than 25% of
the existing size, as measured in square footage of the
foundation or cubic footage of the structure, shall be
considered a new building and shall site as much of the project
as possible outside of the buffer zone .
vi. All new construction within the buffer zone shall incorporate
gutters and roof drains which direct roof drainage into drywells
or leaching pits or incorporate drip lines with crushed stone
sufficient to prevent soil erosion.
vii. Driveways within the buffer zone shall be constructed with
pervious materials. The Commission may allow paved
driveways, where special circumstances exist (e.g. steep
slopes), provided that stormwater from the contributing area is
managed according to Stormwater Best Management Practices,
including the installation of deep sump catch basins and
leaching pits where appropriate.
b. For lots and subdivisions recorded after November 19, 2003, the
alternatives analysis shall include all alternatives available prior to
subdivision of the lot(s) and all work shall be located outside the
100-foot Buffer Zone.
2. Within the 50-foot Filter Strip, the Commission may issue an Order of
Conditions allowing the following activities:
a. Pruning to reduce a hazard, to improve tree or plant structure, to
provide a reasonable vista, or to improve the health of trees and
shrubs.
b. Selective Cutting of vegetation
c. Elevated stairways over a Coastal Bank and Inland Bank
2.02(4): Buffer Zone (including the 50-foot Filter Strip) (cont.):
d. Removal of invasive species
e. Planting of native vegetation
f. Habitat management activities designed to enhance the values
protected by the Wellfleet Environmental Protection Bylaw;
g. Construction and maintenance of unpaved pedestrian access paths
not more than 4-feet in width;
h. Maintenance of existing structures, utilities, stormwater
management structures;
i. Construction and maintenance of water dependent structures and
uses;
j. Construction of new utility lines where the proposed route is the
best environmental alternative;
k. Septic system maintenance and, if a system has failed,
repair/replacement meeting state/local standards where the
disturbance to the buffer zone is avoided and/or minimized to the
maximum extent practicable;
l. Construction, maintenance, repair/replacement of drinking water
wells;
m. Maintenance, repair and drainage improvements on existing
roadways and driveways.
3. The following activities are prohibited within the 50-foot Filter Strip:
a. New and/or expanded lawn areas;
b. New structures including but not limited to homes, buildings,
garages, sheds and decks;
c. Expansion of existing structures including but not limited to
homes, buildings, garages, sheds and decks;
2.03 Freshwater Wetland:
(1) Preamble:
Freshwater Wetlands are likely to be significant to the public interests
and environmental values of public and private water supply, groundwater
supply and quality, flood control, storm damage prevention, erosion and
sedimentation control, prevention of pollution, to the protection of fisheries,
wildlife habitat and rare species habitat.
The plants and soils of freshwater wetlands remove and detain
nutrients and toxic substances that occur in stormwater run-off and flood
waters. Some nutrients and toxic substances are detained for years in plant
root systems and in the soil. Others are detained by plants during the growing
season and released as the plants decay in the fall and winter. This latter
2.03 Freshwater Wetland (cont.):
phenomenon delays the impacts of nutrients and toxins until the cold weather
period, when such impacts are less likely to impact water quality.
Freshwater wetlands are areas where groundwater discharges to the
lands surface and where, under some circumstances, surface water discharges
to the ground water. While hydrology is the driving force which creates
wetlands, it is transient and temporal in nature. The presence of water at or
near the ground surface during a portion of the year supports, and in fact
promotes, the growth of wetland indicator plants. Prolonged or frequent
saturation or inundation also produces hydric soils, and creates anaerobic
conditions that favor the growth of wetland indicator plants. Hydric soils are
direct indicators of long-term hydrologic conditions and are present
throughout the year.
Wetland vegetation supports a wide variety of insects, reptiles,
amphibians, small mammals, and birds which may serve as a source of food
for fisheries. Wetland vegetation also provides shade which moderates water
temperatures important to fish and also to species that occupy vernal pools.
Freshwater wetlands provide important wildlife habitat. The hydrologic
regime, plant community composition and structure, soil composition and
structure, topography, and water chemistry of freshwater wetlands provide
important food, shelter, migratory and over-wintering areas, and breeding
areas for many birds, mammals, amphibians and reptiles. The diversity of
freshwater wetlands in terms of the structure and composition of the
vegetation, soils and hydrology provide a variety of habitats for various
species of wildlife which may use these areas seasonally or year round.
Although the vegetational community alone can often be utilized to
establish an accurate wetland boundary, the presence of hydric soils and
hydrology can supplement the vegetative criteria and enhance the technical
accuracy, consistency and credibility of wetland boundary delineations, and
are especially useful for analyzing disturbed sites.
(2) Definition, Critical Characteristics and Boundary.
(a) Freshwater wetlands include, but are not limited to, wet meadows,
marshes, swamps and bogs. Freshwater wetlands are areas where the soils
are saturated and/or inundated such that they support a predominance of
wetland indicator plants or, in the absence of vegetation and in areas
where the vegetational community has been disturbed or altered, are areas
that have characteristics of hydric soils or other indicators of wetland
hydrology including, but not limited to the presence of oxidized
rhizospheres and buttressed or water-stained tree trunks.
(b) Freshwater wetlands include Vernal Pools as defined at WEPR 1.04(2).
2.03 Freshwater Wetland (cont.):
(3) Presumption of Significance. Where a proposed activity involves the
removing, filling, dredging or altering of a freshwater wetland, the
Conservation Commission shall presume that such area is significant to the
interests and environmental values of the Wellfleet Environmental Protection
Bylaw.
(4) General Performance Standards
(a) Removing, filling, dredging or draining of freshwater wetlands,
whether they are bordering or not, is prohibited.
2.04: Coastal Bank:
(1) Preamble: Coastal Banks are likely to be significant to the public interests
and environmental values of storm damage prevention, flood control,
prevention of pollution, erosion and sedimentation control, protection of land
containing shellfish, and protection of wildlife habitat.
Coastal Banks are variable in their form and function. Coastal Banks
composed of unconsolidated sediment that are subject to wave action serve as
a continuous source of sediment for beaches, dunes, barrier beaches and other
land forms that exist due to coastal processes. Sediment is removed from
Coastal Banks by wave action and deposited in down-drift areas. The amount
and timing of sediment removal is dependent on beach and sea conditions
which may change over time. Coastal erosion and sediment removal from
coastal banks is a naturally occurring process that is necessary to the
continued existence of coastal beaches, coastal dunes and barrier beaches
which, in turn, dissipate storm wave energy, thus protecting the structure and
function of coastal wetlands landward of them from storm damage and
flooding and protecting land containing shellfish and wildlife habitat.
Waves and currents associated with coastal processes also remove fine
grained sediments (e.g. fine sand & silt) from Coastal Banks which serve as
source material for inter-tidal and sub-tidal areas. These areas serve to reduce
destructive energy associated with storm waves, and also allow continued
vertical build-up of substrate. As relative sea level continues to rise, and
possibly accelerate as predicted, it is important to provide source material to
allow these inter-tidal and sub-tidal areas to vertically accrete and continue to
provide storm damage prevention, flood control, protection of land containing
shellfish, and protection of wildlife habitat.
Coastal Banks, because of their height and stability, may act as a
buffer, or natural wall, which protects adjacent lands from storm damage,
flooding. While erosion caused by wave action is an integral part of shoreline
processes and furnishes important sediment to down-drift landforms, erosion
2.04: Coastal Bank (cont.):
of a Coastal Bank by wind, rain and stormwater runoff, which plays only a
minor role in beach nourishment, shall not be increased unnecessarily.
Therefore, disturbances to a Coastal Bank which reduce its natural resistance
to wind and rain erosion, cause cuts and gulleys in the bank, increase the risk
of its collapse, increase the danger to structures at the top of the bank and
decrease its value as a buffer.
Bank vegetation tends to stabilize the bank and reduce the rate of
erosion due to wind, rain and stormwater flow. Pedestrian and vehicular
traffic damages the protective vegetation and frequently leads to gulley
erosion or “blowouts” on unconsolidated banks.
A particular Coastal Bank may serve as both a sediment source and as
a vertical buffer, or it may serve only one role.
(2) Definition, Critical Characteristics and Boundary: Coastal Bank means the
seaward face or side of any elevated landform, other than a coastal dune,
which lies at the landward edge of a coastal beach, land subject to tidal action,
or other coastal wetland. Coastal banks shall be delineated in accordance with
the Massachusetts Department of Environmental Protection Wetlands and
Waterways Policy: Coastal Banks: Definition and Delineation Criteria for
Coastal Banks (DWW Policy 92-1).
(3) Presumption of Significance: Where a proposed activity involves work on a
Coastal Bank, the Commission shall presume that such area is significant to
storm damage prevention, flood control, erosion control, prevention of
pollution, protection of land containing shellfish, protection of fisheries, and
protection of wildlife habitat. This presumption may be overcome only upon
clear and convincing proof that the Coastal Bank does not play a role in the
protection of said interests and environmental values protected by the Bylaw
and if the Conservation Commission makes a written determination to that
effect.
Coastal Banks that have all or a portion of the bank within a FEMA V
– zone of the mapped 100-year coastal floodplain are significant to storm
damage prevention or flood control because they supply sediment to coastal
beaches, coastal dunes, barrier beaches or tidal flats, the ability of the coastal
bank to erode in response to wave action is critical to the protection of said
interests and environmental values.
When the Conservation Commission determines that a Coastal Bank is
significant to storm damage or flood control because it acts as a vertical buffer
to storm surges, the stability of the bank and the natural resistance of the bank
to erosion caused by wind, rain, and stormwater runoff is critical to the
protection of said interests and environmental values.
2.04(4): Coastal Bank (cont.):
(4) General Performance Standards:
(a) When a Coastal Bank is determined to be significant to storm damage
prevention or flood control because it supplies sediment to coastal beaches,
coastal dunes or barrier beaches the following performance standards shall apply:
1. Coastal engineering structures (CES) which will reduce the ability of
the Coastal Bank to provide sediment to coastal beaches, coastal
dunes, barrier beaches, tidal flats, or sub-tidal areas shall not be
allowed.
2. Notwithstanding WEPR 2.04(4)(a)1., the Commission may allow a
CES when required to prevent storm damage to buildings constructed
prior to August 10, 1978, provided that the following requirements are
met:
a. A CES shall not be permitted for buildings greater than 40 feet
from the top of the Coastal Bank or for buildings more than 20
years from the top of the bank based on long-term annual erosion
rates for that specific site. The Conservation Commission may
consider a short-term erosion rate for certain sites where human
activity has altered the natural coastal processes or natural
sediment sources for that site.
b. A CES or modification thereto shall be designed and constructed
so as to have no significant adverse impact on adjacent or nearby
coastal beaches, coastal banks, coastal dunes, salt marsh, land
containing shellfish or other seaward wetland resource areas.
c. Alternatives Analysis – The applicant shall provide a written
analysis of alternative solutions, in writing and stamped by a
Registered Professional Engineer, to the Commission at the time of
filing the Notice of Intent. The alternatives analysis shall include
the following.
i. Proof that there are no feasible alternative methods of
protecting the building other than the proposed CES.
Feasible alternatives include moving the threatened building
to an alternative location on the same parcel or an adjacent
parcel of land currently or formerly (limited to the time
period after the effective date of these Regulations) owned by
the applicant, or in which the applicant has, or can obtain an
ownership interest (i.e. a Realty Trust or other legal entity).
ii. The applicant may be required to demonstrate that a “nonstructural
solution” has been tried at the site and has failed to
provide adequate protection from storm damage to the
building. The commission shall require detailed maintenance
records to show that the system was properly maintained.
2.04: Coastal Bank (cont.):
d. Project design, site mitigation and restoration plans shall be
submitted to the Commission at the time of filing the Notice of
intent. The plans shall be consistent with the following criteria:
i. A narrative describing the methods used to determine Mean
High Water (MHW) at the site shall include all calculations
(including datum conversion) used to determine MHW for
the site and shall be submitted to the Commission at the time
of filing the Notice of Intent. Field measurements of MHW
contour shall be detailed on the plans and submitted for two
time periods: late winter/early spring (February – April)
AND late summer/autumn (August – October). The more
landward delineation of MHW shall be used.
ii. The applicant shall obtain a sediment grain size analysis of
the existing Coastal Bank, which shall be signed and stamped
by a Registered Professional Engineer, and shall provide the
results to the Commission at the time of filing the Notice of
Intent. The applicant shall detail on the plans where on the
Coastal Bank the sediment sample(s) were taken, the number
of samples taken, and the method of grain size analysis (e.g.
single sample or composite). This analysis shall be the basis
for determination of appropriate nourishment material.
iii. A CES shall be designed with a return which shall avoid,
minimize and mitigate end scour effects on neighboring
properties. If a CES is proposed adjacent to a property not
protected by a CES, the return or end of the structure shall be
set back not less than 15 feet from the property line.
iv. The CES shall be covered with sand/soil of an appropriate
grain size at the completion of the project. The Commission
may require this area to be vegetated with native coastal
plants where appropriate, so as to provide the sacrificial
bank/dune stability and also to improve wildlife habitat. If
planting is proposed, the applicant shall submit a plant
species list, plans showing the plant spacing and density of
plantings, and a vegetation maintenance and monitoring plan
to ensure plant survival and success.
e. The applicant shall provide a Coastal Bank/Beach nourishment
plan, signed and stamped by a Registered Professional Engineer, to
the Commission at the time of filing the Notice of Intent. The
approved Coastal Bank/Beach nourishment plan shall become an
ongoing condition and remain in place and effect for the life of the
structure or until the Commission deems it has caused an adverse
2.04: Coastal Bank (cont.):
impact to a coastal wetland resource area. The nourishment plan shall
consist of:
i. Site mitigation and restoration plan, including restoration of the
access area. This plan is required to assess impacts to areas
subject to protection under the Bylaw during and immediately
following construction and following Bank/Beach nourishment
and to plan appropriately for the restoration of these areas.
ii. An annual maintenance and monitoring plan for bank/beach
nourishment. This plan is required to establish an annual
monitoring and maintenance schedule to identify any problems
with the structure, assess impacts caused by the structure, and
to determine the volume of sand to be placed on the
Bank/Beach for the year. Bank/beach nourishment shall be
done annually between April 1 and May 31.
iii. Planting and re-vegetation schedule and plan, including a plant
species list, the plant spacing and density and maintenance and
monitoring plan to ensure plant survival and success.
f. Coastal Bank/Beach nourishment shall have no significant adverse
impact to coastal wetland resource areas or the public interests
and environmental values protected under the Bylaw. Coastal
Bank/Beach nourishment may be discontinued or reduced in scale
and frequency only by a determination by the Commission that
the nourishment program is adversely affecting one or more of the
above resources, interests and values.
3. A stairway or boardwalk may be permitted over a Coastal Bank
provided that it has no adverse impact on the form and function of the
Coastal Bank and the following criteria are met:
a. With the exception of the pilings, all other parts of the stairway or
boardwalk shall be elevated greater than 18 inches above the
surface of the ground. All stairways shall follow the contours of
the land as closely as possible.
b. Stairways shall incorporate open risers.
c. Decking planks shall be spaced a minimum of ½ inch apart.
d. The stairway structure shall be no more than 4 feet in overall
width, including but not limited to the supporting posts and hand
rails.
e. The preservative treatment for any wood touching the surface of
the ground shall be non-toxic. Use of CCA and creosote treated
lumber is prohibited.
f. The Commission may allow a resting landing on a stairway that
shall seat no more than two individuals in some instances due to
the height, steepness or other factors of the bank.
2.04: Coastal Bank (cont.):
g. All stairways shall be maintained in good condition. Stairways
that fail or collapse shall be removed or repaired immediately.
2.05 Land Subject to Coastal Storm Flowage and Wellfleet Harbor ACEC
(Effective 3/15/11)
(1) Preamble:
Land subject to coastal storm flowage (LSCSF) may include coastal beaches, salt
marshes, banks, barrier beaches, salt ponds, dunes, land containing shellfish, land under
the ocean, and banks of and land underlying fish runs as defined in the Massachusetts
Wetlands Protection Act Regulations (310 CMR 10.00). LSCSF is important for the
protection of public and private water supply, groundwater and groundwater quality,
flood control, erosion and sedimentation control, storm damage prevention, water
pollution prevention, wildlife and wildlife habitat, fisheries, and shellfish.
The wetland values of specific resource areas, including those identified above,
that lie within the area of LSCSF and are otherwise addressed in this Bylaw and the
regulations promulgated there under are incorporated in this section by reference. A
healthy and undisturbed LSCSF supports the resource area values discussed below. These
values should not be adversely affected and should be enhanced when and where
necessary.
Areas of Critical Environmental Concern (ACECs) are places in Massachusetts
that receive special recognition because of the quality, uniqueness and significance of
their natural and cultural resources. These areas are identified and nominated at the
community level and are reviewed and designated by the state’s Secretary of
Environmental Affairs. ACEC designation creates a framework for local and regional
stewardship of critical resources and ecosystems.
(a) Storm Damage Prevention
LSCSF includes land that lies at the margin between upland and land subject to
average (normal) coastal and wind-driven processes. When coastal conditions are not
the norm - during extreme high tides and hurricanes, for example - the need for the
land to absorb flood waters and buffer inland areas from flood and wave damage is
significant.
Velocity zones (V-zones) and overwash zones (AO-zones) of LSCSF are areas which
are subject to hazardous flooding, wave impact and in some cases significant rates of
erosion as a result of wave impact and scour. Alteration of land surfaces in A, V, and
AO zones can change drainage characteristics resulting in increased flood damage on
adjacent properties.
2.05 Land Subject to Coastal Storm Flowage and Wellfleet Harbor ACEC (Cont.)
The topography, soil structure (e.g., composition, size, density & shape), vegetation,
vulnerability to erosion and permeability of the land surface within V- and AO-zones are
critical characteristics which determine how effective an area is in dissipating wave energy
and in protecting areas within and landward of these zones from storm damage and flooding.
A gentle and permeable seaward-sloping land surface is more effective at reducing the height
and velocity of incoming storm waves. Wave energy is expended in eroding and transporting
materials comprising the land surface within the V- and AO-zones, as well as by percolation
or the downward movement of stormwater through more permeable land surfaces, thereby
lessening the effects of backrush, scour and erosion.
Dredging or removal of materials within the V- and AO-zones can act to increase the
landward velocity and height of storm waves thereby allowing them to break farther inland
and to impact upland and wetland resource areas which might not otherwise be affected.
Filling and placement of solid fill structures within V- and AO-zones may cause the
refraction, diffraction and/or reflection of waves, thereby forcing wave energy onto adjacent
properties, natural resources, and public or private ways, potentially causing otherwise
avoidable storm damage. When struck with storm waves, solid structures within V- and AOzones
also may increase localized rates of erosion and scour (Shore Protection Manual, US
Army Corps of Engineers, 1984 V. 1, pg. 5-3 & 5-5). Placing man-made structures in
floodplain areas may result in direct and collateral damage to such structures during storm
and heavy rain events, by wave impact and flood water inundation, and by storm-driven
debris.
In some cases, the placement of fill in hydraulically restricted portions of the coastal
floodplain may increase flood levels in heavy rainfall events. The placement of fill in AHzones,
where ponding occurs generally as a result of overwash in coastal floodplains, may
increase flood levels on the subject and adjacent properties above pre-fill flood levels.
Much of the LSCSF within Wellfleet is designated as part of the Wellfleet Harbor Area of
Critical Environmental Concern (ACEC). The ACEC resources were designated because of
their extraordinary and unique character. Generally, the purpose of the ACEC is to preserve,
restore, and enhance critical environmental resources. The goal of the program is to increase
the level of protection for the ACEC, and to facilitate and support the stewardship of the
ACEC.
(b) Prevention of Pollution
Natural or relatively undisturbed coastal floodplains (LSCSF) can reduce erosion and
sedimentation, and in a vegetated state can prevent pollutants contained in surface runoff
from directly entering waterways and other wetland areas during flood events. Since the
floodplain contains areas in which the water table is close to the surface, during a coastal
storm, pollutants in the flood plain, including the contents of septic systems and fuel tanks,
are likely to affect public and private water supply, groundwater quality, wildlife and wildlife
habitat, fisheries and shellfish. However, undisturbed LSCSF can help abate the potential
adverse impacts of pollutants through vegetation absorption.
2.05 Land Subject to Coastal Storm Flowage and Wellfleet Harbor ACEC (Cont.)
(c) Wildlife Habitat
LSCSF areas are low-lying areas that are ecologically transitional between marine/estuarine
ecosystems and upland areas. Resource areas within the 100-year floodplain are critical
habitats for a large variety of wildlife species. For example, salt marshes provide habitat for
many crustaceans and mollusks and serve as critical nursery areas for numerous fin fish
species which in turn provide food for species higher up in the food chain, e.g., herons,
osprey, mink and raccoon. These resource areas also provide important over-wintering and
stopover areas for many species of waterfowl.
Coastal floodplains (LSCSF) adjacent to other wetland resource areas provide important
wildlife functions, such as nesting and roosting habitat, and serve as wildlife corridors
connecting coastal zone resources with freshwater wetland resources. Adjacent areas within
the coastal floodplain also serve as transitional zones needed to protect the coastal wetland
resources’ ability to provide essential habitats (Guidance Specifying Management Measures
for Sources of Non-point Pollution in Coastal Waters, EPA, 1993: Castelle, et al., 1992, pgs
5 & 6).
(d) Sea Level Rise
Areas of coastal floodplains (LSCSF) which are immediately landward of salt marshes,
coastal beaches, barrier beaches, coastal dunes or coastal banks require special protection.
These areas are likely to be in a state of transition as the entire complex of coastal wetland
resources gradually moves landward as sea levels rise. For thousands of years, relative sea
level has been rising in Massachusetts, and it is still rising (Smith, Clayton, Mayo and Giese,
1978), resulting in gradual inundation of landward area. Historic sea level measurements
indicate that relative sea level in Massachusetts is rising at approximately 1 foot per 100
years (Giese, et al, 1978). As sea level rises, the shoreline may retreat, and areas of the
coastal floodplain will successively be inundated more frequently by storm and tidal activity.
Activities carried out within these special transitional areas of coastal floodplains may
interfere with the natural landward migration of the adjacent coastal resource areas.
Maintaining these special transitional areas in their natural state is critical to the protection of
the interests of other wetland resources found within LSCSF.
(2) Definitions:
(a) Land Subject to Coastal Storm Flowage - Land subject to tidal water, flooding, or any inundation
caused by coastal storms up to and including that caused by the 100year storm, the surge of record
or the storm of record, whichever is greatest. Land Subject to Coastal Storm Flowage is delineated
as the l00-year flood plain (Zones, A, AO, AH, A1-A30, A99, V, and V1-V30) on the Flood
Insurance Rate Maps, prepared by the National Flood Insurance Program for the Town of Wellfleet
or as otherwise documented.
2.05 Land Subject to Coastal Storm Flowage and Wellfleet Harbor ACEC (Cont.)
(b) A Zone (including A-, AE, A1-30, and A99) – A zones are those portions of the land subject to
coastal storm flowage which are subject to inundation by types of 100 year flooding where still
water predominates
(c) AO Zone, Overwash – Those portions of land subject to coastal storm flowage which are subject
to inundation by moving water where average depths are between one and three feet. AO Zones are
commonly associated with overwash and generally border on the landward side of a Velocity Zone.
(d) AH Zones- Those portions of land subject to coastal storm flowage which correspond to the
areas of 100-year shallow flooding with a constant water-surface elevation (usually areas of
ponding) where average depths are between 1 and 3 feet.
(e) V – Zone- Those portions of land subject to coastal storm flowages which are subject to
inundation by velocity hazard (wave action)
(f) ACEC (Area of Critical Environmental Concern) - Natural and cultural resources with state
designation for their high quality, uniqueness, and significance. ACECs within Wellfleet include the
Wellfleet Harbor ACEC designated in 1989 totaling 12,480 acres within the towns of Eastham,
Truro, and Wellfleet.
(g) Diffraction- The apparent bending of waves around small obstacles and the spreading out of
waves past small openings.
(h) Refraction-The change in direction of a wave due to a change in its speed.
(i) Reflection- The change in direction of a wave front at an interface between two different media
so that the wave front returns into the medium from which it originated
(3) Presumption of Significance
Where a proposed activity involves work within LSCSF or within the Wellfleet Harbor ACEC
the Conservation Commission shall presume that such area is significant to the interests and
environmental values of the Wellfleet Environmental Protection Bylaws. This presumption may be
overcome only upon clear and convincing proof, provided by the applicant that the area in discussion
does not play a role in the protection of said interests and environmental values protected by the bylaw
and if the Conservation Commission makes a written determination to that effect.
2.05 Land Subject to Coastal Storm Flowage and Wellfleet Harbor ACEC (Cont.)
(4) Performance Standards
(a) Any activity proposed on LSCSF or within the Wellfleet Harbor Area of Critical Environmental
Concern shall not:
(1) Reduce the ability of the resource to absorb and contain flood waters;
(2) Reduce the ability of the resource to buffer more inland areas from
flooding and wave damage;
(3) Displace or divert flood waters to other areas;
(4) Cause or create the likelihood of damage by debris to other structures
on land within the flood plain (collateral damage);
(5) Cause ground, surface or saltate pollution triggered by coastal storm
flowage;
(6) Reduce the ability of the resource to serve as a wildlife habitat and
migration corridor through activities such as, but not limited to the
removal of substantial vegetative cover and/or installation of fencing
and other similar structures.

Home Page Link
Town Hall: 300 Main Street, Wellfleet, MA 02667
Phone: 508-349-0300   Fax: 508-349-0305
Subscribe to Notices
Send Us Comments